Nottingham Station
Project OverviewRED Systems were asked to take on the Structural Glazing package at Nottingham Train Station HUB.
Works included ‘Blast Mitigating’ Structural Glazing to the Tram Interchange Hub which included 700m2 of façade glazing, glazed louvres and two structurally glazed rooflights with challenging geometry.
East Midlands Trains and Networks Rail developed a design to renovate the existing Grade II listed Edwardian Station Building whilst adding a new state of the art tram station. British Transport Police required a bomb blast criteria to be incorporated to the façade design.
When providing the design solution for this project, our design team considered the Grade II status of the building as well as the complicated geometry of the rooflights.